Yaskawa G7 Drive User Manual Page 412

  • Download
  • Add to my manuals
  • Print
  • Page
    / 454
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 411
Maintenance and Inspection
8-3
Periodic Maintenance of Parts
The Drive is configured of many parts, and these parts must be operating properly in order to make full use of
the Drive functions.
Among the electronic components, there are some that require maintenance depending on their usage condi-
tions. In order to keep the Drive operating normally over a long period of time, it is necessary to perform
period inspections and replace parts according to their service life.
Periodic inspection standards vary depending the Drive's installation environment and usage conditions. The
Drive's maintenance periods are noted below. Keep them as reference.
Note The standard replacement period is based on the following usage conditions:
Ambient temperature:Yearly average of 30°C
Load factor: 80% max.
Operating rate: 12 hours max. per day
Table 8.2 Part Replacement Guidelines
Part Standard Replacement Period Replacement Method
Cooling fan 2 to 3 years Replace with new part.
Smoothing capacitor 5 years
Replace with new part. (Determine need by
inspection.)
Breaker relays - Determine need by inspection.
Fuses 10 years Replace with new part.
Aluminum capacitors on PCBs 5 years
Replace with new board. (Determine need by
inspection.)
Page view 411
1 2 ... 407 408 409 410 411 412 413 414 415 416 417 ... 453 454

Comments to this Manuals

No comments